{"id":11413,"date":"2021-11-09T15:00:03","date_gmt":"2021-11-09T14:00:03","guid":{"rendered":"https:\/\/www.energyteam.it\/servizi-demand-response\/interrompibilita-elettrica\/"},"modified":"2023-06-06T18:27:43","modified_gmt":"2023-06-06T16:27:43","slug":"electrical-interruptibility","status":"publish","type":"page","link":"https:\/\/www.energyteam.it\/en\/demand-response-solutions\/electrical-interruptibility\/","title":{"rendered":"Electrical Interruptibility"},"content":{"rendered":"\n<p>Electrical Interruptibility is included in the \u201cDefence systems for the national electricity service\u201d and the mechanism was launched by Terna in 2001. It aims to involve demand units connected at medium and high voltage for correct balancing of the national electricity grid. This service involves reduction in a customer\u2019s withdrawal within 200 ms following a disconnection request from Terna, operator of the Italian national electricity grid.<\/p>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link has-primary-background-color has-background wp-element-button\" href=\"https:\/\/www.energyteam.it\/en\/demand-response-solutions\/electrical-interruptibility\/#form\" style=\"border-radius:0px\"><strong>Get in touch to discover more<\/strong><\/a><\/div>\n<\/div>\n\n\n\n<div style=\"height:48px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h4 class=\"wp-block-heading has-primary-color has-text-color\"><strong>How does Electrical Interruptibility work?<\/strong><\/h4>\n\n\n\n<p><\/p>\n\n\n\n<div class=\"wp-block-media-text alignwide has-media-on-the-right is-stacked-on-mobile\" style=\"grid-template-columns:auto 52%\"><div class=\"wp-block-media-text__content\">\n<p>The service involves a company being prepared to interrupt their withdrawal of power from the grid within 200 ms. To enable Terna to perform this activity for correct balancing of the national electricity grid, users must equip themselves with an advanced system for real-time monitoring of consumption and to trigger disconnections.<\/p>\n\n\n\n<p>This system is referred to as a UPDC (peripheral load-disconnection unit).<\/p>\n<\/div><figure class=\"wp-block-media-text__media\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"634\" src=\"https:\/\/www.energyteam.it\/wp-content\/uploads\/2022\/06\/ENG_int.elettrica-1024x634.png\" alt=\"\" class=\"wp-image-11495 size-full\" srcset=\"https:\/\/www.energyteam.it\/wp-content\/uploads\/2022\/06\/ENG_int.elettrica-1024x634.png 1024w, https:\/\/www.energyteam.it\/wp-content\/uploads\/2022\/06\/ENG_int.elettrica.png 1082w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure><\/div>\n\n\n\n<div style=\"height:77px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n<section id=\"et_iconrow-block_3e97dcde0f85f7f88d2999e2d50bb791\" class=\"row et_iconrow mb-0\">\n\t<div class=\"col-12 mb-5\">\n\t\t<h2 class=\"h4 font-700 text-primary\">Technical requirements for parties that want to participate in the Electrical Interruptibility mechanism:<\/h2>\t<\/div>\n\t<div class=\"col-12\">\n\t\t<div class=\"row\">\n\t\t\t\t\t\t<div class=\"col-md-4\">\n\t\t\t\t<div class=\"d-flex\">\n\t\t\t\t\t\t\t\t\t<span class=\"display-4 font-condensed\">]<\/span>\n\t\t\t\t\t<img decoding=\"async\" src=\"https:\/\/www.energyteam.it\/wp-content\/uploads\/2022\/04\/Energia-elettrica.png\" alt=\"\" class=\"mb-2 mx-3 d-inline-block h-auto d-block\" style=\"max-width:67px;max-height:67px;\">\n\t\t\t\t\t<span class=\"display-4 font-condensed\">[<\/span>\n\t\t\t\t<\/div>\n\t\t\t\t<p class=\"ml-3 mt-3 mb-5\">Minimum power 1 MW per site (HV\/MV) \u2013 (annual demand of at least 7,000 MWh).<\/p>\n\t\t\t<\/div>\t\t\n\t\t\t\t\t\t<div class=\"col-md-4\">\n\t\t\t\t<div class=\"d-flex\">\n\t\t\t\t\t\t\t\t\t<span class=\"display-4 font-condensed\">]<\/span>\n\t\t\t\t\t<img decoding=\"async\" src=\"https:\/\/www.energyteam.it\/wp-content\/uploads\/2022\/04\/Analizzatori-di-rete.png\" alt=\"\" class=\"mb-2 mx-3 d-inline-block h-auto d-block\" style=\"max-width:67px;max-height:67px;\">\n\t\t\t\t\t<span class=\"display-4 font-condensed\">[<\/span>\n\t\t\t\t<\/div>\n\t\t\t\t<p class=\"ml-3 mt-3 mb-5\">Installation of a UPDC system and participation in Terna auctions.<\/p>\n\t\t\t<\/div>\t\t\n\t\t\t\t\t\t<div class=\"col-md-4\">\n\t\t\t\t<div class=\"d-flex\">\n\t\t\t\t\t\t\t\t\t<span class=\"display-4 font-condensed\">]<\/span>\n\t\t\t\t\t<img decoding=\"async\" src=\"https:\/\/www.energyteam.it\/wp-content\/uploads\/2022\/04\/On-off.png\" alt=\"\" class=\"mb-2 mx-3 d-inline-block h-auto d-block\" style=\"max-width:67px;max-height:67px;\">\n\t\t\t\t\t<span class=\"display-4 font-condensed\">[<\/span>\n\t\t\t\t<\/div>\n\t\t\t\t<p class=\"ml-3 mt-3 mb-5\">Readiness for instant disconnection.<\/p>\n\t\t\t<\/div>\t\t\n\t\t\t\t\t<\/div>\n\t<\/div>\n<\/section>\n\n\n\n\n\n\n\n<h4 class=\"wp-block-heading has-primary-color has-text-color\">Why participate in the Electrical Interruptibility service?<\/h4>\n\n\n\n<p>Companies willing to sign up to this mechanism supporting the electricity grid can earn in the form of a fixed annual fee and a variable fee for each request of \u20ac&nbsp;3,000 per MW.<\/p>\n\n\n\n<p><\/p>\n\n\n\n<h4 class=\"wp-block-heading has-primary-color has-text-color\"><strong>The Energy Team solution<\/strong><\/h4>\n\n\n\n<p>With 25 years of experience in the sector, Energy Team draws on its expertise and provides customers with comprehensive support for optimal management of the service.<br>This support is provided on the basis of three different types of contract:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Full Service<\/strong><br>Provision of technology and support for management, covered entirely with a percentage of income achieved<br><\/li>\n\n\n\n<li><strong>Consulting contract <\/strong>(in the case of purchase of technology by the customer)<br>With payment of a monthly fee, Energy Team handles optimal management of the portals on behalf of the customer, offering its expertise in management of maintenance schedules and participation in auctions to maximise benefits<br><\/li>\n\n\n\n<li><strong>Participation through a consortium<\/strong><br>100% of the auction fee is paid to the customer for Guaranteed Power and there is the option to achieve addition earnings through consortium-based management of power. Energy Team manages two consortia, winning contracts for a total of 270 MW<br><\/li>\n<\/ul>\n\n\n\n<p>On&nbsp;<a href=\"https:\/\/www.cloe-energy-team.it\/\" target=\"_blank\" rel=\"noreferrer noopener\">Energy Team\u2019s software platform, CloE<\/a> an app is available specifically for interruptible users that tracks, analyses and stores communications between the UPDC and Terna, publishing information on a server for customers to consult historical data and calculate the remuneration due.<\/p>\n\n\n\n<p><\/p>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h4 class=\"wp-block-heading has-primary-color has-text-color\">Discover the monthly reduction service for interruptible customers<\/h4>\n\n\n\n<p>Interruptible companies have the opportunity to participate in Terna&#8217;s new consumption reduction service, making themselves available to reduce the withdrawal of electricity from the grid. The call for the reduction can take place with two days notice for the period 10 February &#8211; 31 December 2023. For this availability, the companies will obtain a fee of up to \u20ac59,200\/MW (pay as bid).<br>Energy Team participated in the service involving its customers for a quantity equal to 75 MW out of a total of 258 MW awarded in the auction held on February 7, 2023.<\/p>\n\n\n\n<p><strong>More than 500 customers are already using our interruptibility services. Join them!<\/strong><\/p>\n\n\n\n<p>On&nbsp;<a href=\"https:\/\/www.cloe-energy-team.it\/\" target=\"_blank\" rel=\"noreferrer noopener\">Energy Team\u2019s software platform, CloE<\/a> an app is available specifically for interruptible users that tracks, analyses and stores communications between the UPDC and Terna, publishing information on a server for customers to consult historical data and calculate the remuneration due.<\/p>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link has-primary-background-color has-background wp-element-button\" href=\"https:\/\/www.energyteam.it\/en\/demand-response-solutions\/electrical-interruptibility\/#form\" style=\"border-radius:0px\"><strong>Get in touch to discover more<\/strong><\/a><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" id=\"form\"><\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Electrical Interruptibility is included in the \u201cDefence systems for the national electricity service\u201d and the mechanism was launched by Terna in 2001. It aims to involve demand units connected at [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":8602,"parent":11406,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"_relevanssi_hide_post":"","_relevanssi_pin_for_all":"","_relevanssi_pin_keywords":"","_relevanssi_unpin_keywords":"","_relevanssi_related_keywords":"","_relevanssi_related_include_ids":"","_relevanssi_related_exclude_ids":"","_relevanssi_related_no_append":"","_relevanssi_related_not_related":"","_relevanssi_related_posts":"8745,3272,6389,1551,3499,1560","_relevanssi_noindex_reason":"","footnotes":""},"class_list":["post-11413","page","type-page","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.energyteam.it\/en\/wp-json\/wp\/v2\/pages\/11413","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.energyteam.it\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.energyteam.it\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.energyteam.it\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.energyteam.it\/en\/wp-json\/wp\/v2\/comments?post=11413"}],"version-history":[{"count":10,"href":"https:\/\/www.energyteam.it\/en\/wp-json\/wp\/v2\/pages\/11413\/revisions"}],"predecessor-version":[{"id":13484,"href":"https:\/\/www.energyteam.it\/en\/wp-json\/wp\/v2\/pages\/11413\/revisions\/13484"}],"up":[{"embeddable":true,"href":"https:\/\/www.energyteam.it\/en\/wp-json\/wp\/v2\/pages\/11406"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.energyteam.it\/en\/wp-json\/wp\/v2\/media\/8602"}],"wp:attachment":[{"href":"https:\/\/www.energyteam.it\/en\/wp-json\/wp\/v2\/media?parent=11413"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}